Now in Outbuild you can create your Gantt schedule from scratch!
The first thing you should do before creating the structure of your Gantt chart is to configure the calendar(s) that you will use for your project. You can learn about the subject in How to configure a calendar?
The creation of activities is fast and simple. Initially you will have available a master activity with 3 sub-activities, which you can edit.
You can create the following levels of the structure as you wish with the + button of each activity, quickly entering the information of each of them.
To link the activities with each other, you can do it in two ways:
Entering the information in the "Predecessors" column of the corresponding activity.
Directly on the activity bars, dragging and dropping between the activities to be linked.
Learn more in Links between activities .
Also, you can configure the types of Roadblocks of your activities. Learn more at Types of Roadblocks .
Note: Remember to save any changes you make to your Master Plan before exiting that module.
Finally, when you have assembled your Master Plan, you can establish the baseline of the project. Learn more at Set Baseline .